# AutoForge documentation The implemented scope includes the accepted Step-01/Step-01A foundation, accepted Step-02/Step-02A vehicle-profile metadata, and the Step-03 synthetic diagnostic vertical slice with the Step-03A integrity/verification corrections. Worker completion/verification is reported separately from manual orchestrator acceptance; Step-03 is not accepted until that review. - [Architecture](architecture.md): actual nine-project graph, responsibilities, route ownership and provider/reference boundaries. - [Synthetic diagnostics protocol v1](synthetic-diagnostics-v1.md): request and response envelope, outcomes, validation, logical timing and bounded trace. - [Simulation definitions and state](simulation.md): profile binding, module inventory, service declarations, per-session DTC state and deterministic faults. - [ADR-0001: Headless .NET 10 foundation](adr-0001-headless-foundation.md): historical foundation decisions; dual-shell/deferred-host decision superseded. - [ADR-0002: Single native shell and feature slices](adr-0002-single-shell-vsa.md): one Client, two RCLs and modular-monolith composition. - [ADR-0003: Strict profile interchange v1](adr-0003-profile-interchange-v1.md): immutable profile revisions, strict versioned JSON and in-memory catalog. - [ADR-0004: Synthetic diagnostics boundaries](adr-0004-synthetic-diagnostics.md): provider-neutral ports and explicit non-authentic protocol decision. - [Vehicle-profile schema v1](vehicle-profile-schema-v1.md): identity/revision, explicit unknowns, capability/provenance contracts, JSON policy and usage. - [Build and test](build-and-test.md): SDK/MAUI/Windows/WebView2 prerequisites, full solution/test commands and separate native-smoke workflow. See the [root README](../README.md) for product vision and implementation status, the [roadmap](../prompts/ROADMAP.md) for future milestones, and the historical/worker reports for their own execution evidence: [Step-01](../prompts/Step-01-Report.md), [accepted Step-01A](../prompts/Step-01A-Report.md), [Step-02](../prompts/Step-02-Report.md), [Step-02A](../prompts/Step-02A-Report.md) and [Step-03 worker report](../prompts/Step-03-Report.md), [Step-03A corrective worker report](../prompts/Step-03A-Report.md). Handoffs are manual; acceptance remains the orchestrator's responsibility.